SWM-Svosve Logo
  • Home
  • About Us
  • Services
Floods caused by Cyclone Idai

ENVIRONMENTAL AND SOCIAL

  • Health, Safety and Environmental (HSE) Management on Construction Sites

    Health, Safety and Environmental (HSE) Management on Construction Sites

    Read more
  • Thermal Power Plant

    Environmental and Social Impact Assessment (ESIA): Mozambique Power Plants

    Read more
  • Implementation of the Resettlement Action Plan

    Implementation of the Resettlement Action Plan of the Affected People by the Rehabilitation of the Road Between Quelimane City to Namacurra District (70 km)

    Read more
  • Rapid Environmental Assessment and Training in Mozambique After Cyclones Idai and Kenneth

    Rapid Environmental Assessment and Training in Mozambique After Cyclones Idai and Kenneth

    Read more
  • Rehabilitation of the Existing Infulene Wastewater Treatment Plant in Maputo

    Resettlement Action Plan (RAP) for the Rehabilitation of the Existing Infulene Wastewater Treatment Plant in Maputo

    Read more
  • Tete Transmission Mains – Design and Build

    Environmental Management Plan and Abbreviated Resettlement Action Plan (Tete Transmission Mains – Design and Build)

    Read more
  • Design Review and Preparation of Designs

    Design Review and Preparation of Designs

    Read more
  • SWMOZ SVOSVE logo

    SWMOZ SVOSVE is a leading provider of engineering, construction and technical services for public agencies and private sector companies in Mozambique and within the SADC region.

  • Contacts

    location_on Av. Emília Daússe no. 83 - Maputo, Mozambique
    mail admin@swmoz.com
    call +258 21 312 878
    fax +258 304 870
  • Useful Links

    • Roads
    • Bridges
    • Building Infrastructure
    • Water and Sanitation
    • Environmental and Social
    • General Infrastructure
© 2025 SWMOZ SVOSVE Developed by VHM