
TETE RESETTLEMENT PROJECT
Tete Resettlement Project
Design and Supervision of Construction of 73 Houses and associated Infrastructure for the resettlement of families affected by the construction of the New Zambezi Bridge in Tete, Mozambique. This included the design of the water supply and sewer system (septic tanks), general construction works supervision for the 73 Houses and associated infrastructure (water supply, power, roads and stormwater drainage).